"Cisco Others Certification ", also known as 646-222 exam, is a Cisco certification.Preparing for the 646-222 exam? Searching 646-222 Test Questions, 646-222 Practice Exam, 646-222 Dumps?With the complete collection of questions and answers, Test4actual has assembled to take you through 46 Q&A to your 646-222 exam preparation. In the 646-222 exam resources, you will cover every field and category in Cisco Others Certification helping to ready you for your successful Cisco Certification.
Free 646-222 Demo Download
Test4actual offers free demo for Cisco Others Certification 646-222 exam (IP Communications Express Account Manager (IPCXAM)). You can check out the interface, question quality and usability of our practice exams before you decide to buy it. We are the only one site can offer demo for almost all products.
Exam Details
The Cisco Others Certification exam is the qualifying exam available to candidates pursuing a single-exam option for the Cisco Certified Network Associate Cisco Others Certification certification. The Cisco Others Certification (646-222) exam will test materials from the new Interconnection Cisco Network Devices (ICND) course as well as the new Introduction to Cisco Networking Technologies (INTRO) course. The exam will certify that the successful candidate has important knowledge and skills necessary to select, connect, configure, and troubleshoot the various Cisco networking devices. The exam covers topics on Extending Switched Networks with VLANS, Determining IP Routes, Managing IP traffic with Access Lists, Establishing Point-to-Point connections, and Establishing Frame Relay Connections.
FREE DEMO:
1.An account manager is meeting with a customer who is interested in a Cisco IPCommunications solution. This customer manages a large enterprise campus and three smallbranch offices. Which Cisco CallManager Express feature should the account manager discusswith this customer?
A.integrated IP telephony services
B.robust PSTN interfaces
C.interoperability between Cisco CallManager and Cisco CallManager Express
D.remote maintenance
Correct:C
2.Cisco Unity Express adds which three features to the Cisco IP Communications Expresssolution? (Choose three.)
A.data encryption
B.auto attendant
C.voice mail
D.call processing
E.group messaging
F.call routing
Correct:B C F
3.A potential customer has several global offices, including one in North America, two in France,and one in Germany. This prospect is investigating costeffectivevoice mail and auto attendant,and has asked for your recommendation. What application would best meet the needs of thecustomer?A.Cisco Unity Express
B.Cisco Unity
C.customized XML applications
D.Cisco CallManager
Correct:A
4.You require an easytouse,webenabledtool to demonstrate to a prospective customer thebenefits of a converged network in terms of productivity enhancements and real estate savings.Which tool should you use?
A.Cisco ROI analysis
B.Cisco CNIC
C.business case from the industry of the prospect
D.customized hurdle rate analysis
Correct:B
5.The operations manager of a potential customer is concerned about implementing a VoIPsolution because of the possibility of interoperability issues with existing equipment. Whichdifferentiator would be most appropriate to position a Cisco IP Communications solution againstcompetitors?A.An IPenabledPBX does not offer "five nines" availability.
A Cisco IP Communications solution mustintegrate with existing legacy equipment that has 99.999 percent availability.
B.A Cisco IP Communications solution offers investment protection for a large installed base, as well asretention of legacy equipment.Test4actual Information Co., Ltd.All rights reserved.3
C.Proprietary software and IP phones are often used to enable an existing PBX system for IPbasedcommunications, locking the customer into using specific products indefinitely. With a Cisco solution,PBXenableddevices can be used on the network.
D.Cisco IP Communications solutions are based on tested and verified designs that ensure the tightintegration of all equipment and applications, enabling customers to migrate slowly to completeconvergence and retain legacy equipment and existing applications.
Correct:D
http://www.test4actual.com
http://www.test4actual.com/646-222.html
http://test4actual.blogsome.com
没有评论:
发表评论